{"schema_version":"2026-09-05.topic-graph-v1","canonical_url":"https://www.manufacturing.ai/topics/powering-ai","topic":{"slug":"powering-ai","name":"Powering AI: The Electricity Behind the Data Centre","description":"A sourced reference collection on the electricity AI actually consumes — what the measured figures are, how far the published estimates disagree, and why grid connection rather than capital has become the binding constraint on building.","coverage_notes":"Fourth packet through the generic ingestion pipeline (August 2026). Six sources were directly retrieved and two are recorded as references only — both of them IEA pages, which returned HTTP 403. That is the packet's most consequential gap: the IEA's Energy and AI report is the reference most other sources in this field cite, and its figures appear here only at one remove through Carbon Brief, attributed that way rather than presented as read at source. Geographically this collection covers the United States (a Department of Energy national laboratory and Harvard's Belfer Center), Ireland (the energy regulator's own binding decision — the clearest instance anywhere of a state acting on this), China (via Carbon Brief), and global proportion. The China figures are deliberately left unreconciled: published estimates differ by more than a factor of two and no source retrieved this session resolves them, so the spread is asserted as the finding. Two of the six sources are non-peer-reviewed or synthesising preprints and are marked as such; none is ever the primary source for an assertion. Not yet editor-reviewed; every assertion reads as reported.","primer":null,"reviewed_through_date":null,"source_count":6,"inspected_source_count":6,"consulted_reference_count":2,"blocked_reference_count":2,"set_aside_reference_count":0},"figures":[],"blocked_references":[{"title":"AI is set to drive surging electricity demand from data centres while offering the potential to transform how the energy sector works","publisher":"International Energy Agency","url":"https://www.iea.org/news/ai-is-set-to-drive-surging-electricity-demand-from-data-centres-while-offering-the-potential-to-transform-how-the-energy-sector-works","source_type":"press_release","retrieval_status":"blocked_403","content_inspected":false,"published_at":null},{"title":"Energy and AI — Executive Summary","publisher":"International Energy Agency","url":"https://www.iea.org/reports/energy-and-ai/executive-summary","source_type":"other","retrieval_status":"blocked_403","content_inspected":false,"published_at":null}],"set_aside_references":[],"concepts":[{"slug":"ai-rack-power-density","name":"AI Rack Power Density","category":"component","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#ai-rack-power-density","assertions":[{"id":"fe2fe2ab-b379-4867-ad50-aa26e1bad646","predicate":"concept.description","statement":"AI racks draw 30 to over 100 kW against 7-10 kW for traditional servers, and synchronised GPU clusters swing load by hundreds of megawatts within seconds — a ramp-rate problem distinct from, and not addressed by, average consumption figures.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"a65e8065-ffb2-47d0-ad0b-9cfcb8d03956","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","publisher":"arXiv (Chen, Wang, Colacelli, Lee, Xie)","url":"https://arxiv.org/html/2509.07218v1","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-08","documents":[]}},{"id":"94022f86-c9e2-40a7-9539-1005737fe5e5","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","publisher":"arXiv (Chen, Wang, Colacelli, Lee, Xie)","url":"https://arxiv.org/html/2509.07218v1","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-08","documents":[]}}]}]},{"slug":"data-centre-electricity-demand","name":"Data Centre Electricity Demand","category":"other","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#data-centre-electricity-demand","assertions":[{"id":"18c6308b-8082-4001-90c3-74a349ed784f","predicate":"concept.description","statement":"Data centres were just over 1% of global electricity demand and 0.5% of CO2 emissions in 2024 (US nearly half, China ~25%, Europe ~15%); to 2030 they add a projected 530 TWh of demand against 838 TWh for electric vehicles and 651 TWh for air conditioning.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"33a92d0f-0bab-4785-890b-65ced2975aa4","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI: Five charts that put data-centre energy use — and emissions — into context","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/ai-five-charts-that-put-data-centre-energy-use-and-emissions-into-context","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-15","documents":[]}},{"id":"074d9d1b-feb2-4acb-b59d-075c885567c4","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI: Five charts that put data-centre energy use — and emissions — into context","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/ai-five-charts-that-put-data-centre-energy-use-and-emissions-into-context","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-15","documents":[]}}]},{"id":"d23bdfad-c45e-4df7-8c6a-674f4530d459","predicate":"concept.description","statement":"Estimates of China's data centre electricity use disagree by more than a factor of two: 200 TWh for 2020 (State Council), 77 TWh for 2022 (Development Research Centre), roughly 100 TWh for 2024 at a share stated between 0.9% and 2.7%, and 2030 projections from 400 TWh to about 600 TWh.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"0a0ec9ad-97d5-47d4-81d5-712faf9bec3d","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}},{"id":"8dd2257d-da62-4499-abd7-d6c7269d7f20","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}}]},{"id":"e9009710-4c61-440b-a7a7-02990a38a57e","predicate":"concept.description","statement":"US data centres used 58 TWh in 2014 and 176 TWh in 2023 (4.4% of national electricity); Berkeley Lab projects 325-580 TWh by 2028, or 6.7-12% — a range spanning nearly a factor of two, which is the laboratory's own stated uncertainty, not a conflict between sources.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"4f1a2c13-650f-4882-a9a0-0736c7d3a9fb","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Berkeley Lab Report Evaluates Increase in Electricity Demand from Data Centers","publisher":"Lawrence Berkeley National Laboratory","url":"https://newscenter.lbl.gov/2025/01/15/berkeley-lab-report-evaluates-increase-in-electricity-demand-from-data-centers/","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-01-15","documents":[{"url":"https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report.pdf","label":"Publisher’s report link","format":"web","relationship":"publisher_linked_document","access":"human_verification_required","link_checked_at":"2026-09-17","locator":null,"edition":"2024 United States Data Center Energy Usage Report","snapshot_sha256":null,"note":"The publisher's PDF link redirects to an eScholarship record requiring human verification. The report was not opened in this check; the cited source is the summary page."}]}},{"id":"c5f4e571-c784-4be3-82f7-385b4360031b","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}},{"id":"e54daa48-d5be-4b28-bc03-fdc376a66898","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Berkeley Lab Report Evaluates Increase in Electricity Demand from Data Centers","publisher":"Lawrence Berkeley National Laboratory","url":"https://newscenter.lbl.gov/2025/01/15/berkeley-lab-report-evaluates-increase-in-electricity-demand-from-data-centers/","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-01-15","documents":[{"url":"https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report.pdf","label":"Publisher’s report link","format":"web","relationship":"publisher_linked_document","access":"human_verification_required","link_checked_at":"2026-09-17","locator":null,"edition":"2024 United States Data Center Energy Usage Report","snapshot_sha256":null,"note":"The publisher's PDF link redirects to an eScholarship record requiring human verification. The report was not opened in this check; the cited source is the summary page."}]}}]}]},{"slug":"data-centre-energy-mix","name":"Data Centre Energy Mix","category":"other","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#data-centre-energy-mix","assertions":[{"id":"0c1771e4-73be-4ed9-a2f0-b765bc265833","predicate":"concept.description","statement":"Fossil fuels supply nearly 60% of electricity reaching data centres globally, against 27% renewables and 15% nuclear; in China, where coal is 60.5% of the power mix, eastern data centres source roughly 70% of their electricity from coal.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"53352240-7a74-41a6-8e8f-1c57f285d125","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}},{"id":"bd5668ff-532a-4ca2-8f46-2f1b3fc1f950","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI: Five charts that put data-centre energy use — and emissions — into context","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/ai-five-charts-that-put-data-centre-energy-use-and-emissions-into-context","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-15","documents":[]}},{"id":"123c4a0c-432c-4345-bf2a-0168809366b0","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI: Five charts that put data-centre energy use — and emissions — into context","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/ai-five-charts-that-put-data-centre-energy-use-and-emissions-into-context","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-15","documents":[]}}]}]},{"slug":"grid-interconnection-constraint","name":"Grid Interconnection Constraint","category":"other","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#grid-interconnection-constraint","assertions":[{"id":"2559d875-f9e7-4f2f-9ca2-cc7414ad4bee","predicate":"concept.description","statement":"Grid connection, not capital or chips, is now the binding constraint: transmission and distribution upgrades take five to ten years, and PJM capacity prices rose from $28.92 per MW-day for 2024-2025 to $329.17 for 2026-2027, more than a tenfold increase.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"f391f850-db1b-4887-9ca7-e24a87404300","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","publisher":"arXiv (Chen, Wang, Colacelli, Lee, Xie)","url":"https://arxiv.org/html/2509.07218v1","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-08","documents":[]}},{"id":"ade0219d-83f5-472a-9266-d892dd62695b","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","publisher":"arXiv (Chen, Wang, Colacelli, Lee, Xie)","url":"https://arxiv.org/html/2509.07218v1","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-08","documents":[]}}]},{"id":"32a5cdc7-6ded-4535-9c0d-4a02175d0171","predicate":"concept.description","statement":"Cost allocation is unresolved: Dominion Energy proposed its first base-rate increase since 1992 — about $8.51 per month in 2026 and $2.00 more in 2027 for a typical household — while special tariffs risk shifting costs to other consumers and utilities face stranded-asset risk if forecast demand does not appear.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"294dcac9-ba28-42ca-a476-37b5486ac631","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}},{"id":"5388deea-fc1a-4fbb-9ddf-f456ece7df57","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}}]}]},{"slug":"power-usage-effectiveness","name":"Power Usage Effectiveness (PUE)","category":"process","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#power-usage-effectiveness","assertions":[{"id":"7cd2a663-9e50-4d5c-ace8-19f7a1785b2a","predicate":"concept.description","statement":"Power usage effectiveness measures total data centre energy against energy delivered to computing equipment; China uses it as policy, bringing the average from 1.54 to 1.48 under a national action plan with a 1.25 target for large data centres by 2025.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"cdffdda4-7f74-425f-a339-c1712c3ee295","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}},{"id":"4e7e8d10-bb94-4604-83dd-da242b02cb30","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}}]}]}],"events":[{"slug":"cru-ireland-datacentre-connection-decision-2025","title":"Ireland's Energy Regulator Requires New Data Centres to Bring Their Own Generation","category":"other","event_date":"2025-12-12","date_precision":"day","country":"Ireland","region":"Europe","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#cru-ireland-datacentre-connection-decision-2025","assertions":[{"id":"9fb74b9c-5ede-43ab-87ee-dac3d29cb078","predicate":"event.description","statement":"On 12 December 2025 Ireland's Commission for Regulation of Utilities required new data centre grid connections to meet at least 80% of annual demand with additional Irish renewable generation — explicitly excluding capacity already supported under REFIT, RESS or ORESS — and to provide matching onsite or nearby generation or storage participating in the wholesale market.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"305dc1c8-807c-4699-8304-1d72ccfc21cc","stance":"supports","is_primary_for_assertion":true,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"The CRU Publishes its Decision on New Electricity Connection Policy for Data Centres","publisher":"Commission for Regulation of Utilities (Ireland)","url":"https://www.cru.ie/about-us/news/the-cru-publishes-its-decision-on-new-electricity-connection-policy-for-data-centres/","source_type":"regulatory_filing","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-12-12","documents":[]}}]},{"id":"db841aa8-993d-4139-8b8a-ef95a01de38c","predicate":"event.description","statement":"Ireland's regulator states data centres rose from 5% of national electricity demand in 2015 to 22% in 2024, with 9.4 TWh projected for 2025 rising to 14.6 TWh and 31% of national demand by 2034.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"5117811c-8191-4327-9e0b-df6dc7407fdf","stance":"supports","is_primary_for_assertion":true,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"The CRU Publishes its Decision on New Electricity Connection Policy for Data Centres","publisher":"Commission for Regulation of Utilities (Ireland)","url":"https://www.cru.ie/about-us/news/the-cru-publishes-its-decision-on-new-electricity-connection-policy-for-data-centres/","source_type":"regulatory_filing","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-12-12","documents":[]}}]}]},{"slug":"texas-senate-bill-6-2025","title":"Texas Enacts Senate Bill 6 on Large Load Interconnection","category":"other","event_date":"2025-06-01","date_precision":"month","country":"United States","region":"North America","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#texas-senate-bill-6-2025","assertions":[{"id":"773e6d07-925b-4df3-bbfe-2d15cf47a81f","predicate":"event.description","statement":"Texas enacted Senate Bill 6 in June 2025 covering cost sharing, interconnection transparency and emergency operations for large loads, including a $100,000 minimum transmission screening study fee; ERCOT projects peak summer demand of 145 GW by 2031 against 85 GW in 2024, with about 32 GW of it from data centres.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"2a6a835e-2bdd-4cbe-9f07-6bb0ecb45195","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Electricity Demand and Grid Impacts of AI Data Centers: Challenges and Prospects","publisher":"arXiv (Chen, Wang, Colacelli, Lee, Xie)","url":"https://arxiv.org/html/2509.07218v1","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-09-08","documents":[]}},{"id":"c869afb2-71af-4717-8f7b-260d1d982e94","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}},{"id":"9aabcda8-3a85-408b-9a5b-872541bdbfc7","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}}]}]},{"slug":"northern-virginia-datacentre-disconnection-2024","title":"Sixty Northern Virginia Data Centres Disconnect Simultaneously","category":"facility_event","event_date":"2024-07-01","date_precision":"month","country":"United States","region":"North America","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#northern-virginia-datacentre-disconnection-2024","assertions":[{"id":"e0b307b5-6bfb-4cfc-9c59-d4b24a3311a9","predicate":"event.description","statement":"Around sixty Northern Virginia data centres disconnected from the grid simultaneously in July 2024, creating a roughly 1,500 MW power surplus that required emergency adjustments to prevent cascading outages.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"a65666aa-e7be-46cf-83bc-0a79c1d80a3f","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}},{"id":"fbe56ac7-d2ee-413a-ae5d-01aa6deae88f","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","publisher":"Belfer Center for Science and International Affairs, Harvard Kennedy School","url":"https://www.belfercenter.org/research-analysis/ai-data-centers-us-electric-grid","source_type":"academic","retrieval_status":"fetched","content_inspected":true,"published_at":"2026-02-10","documents":[]}}]}]},{"slug":"china-east-data-west-computing-2022","title":"China Launches the East Data West Computing Programme","category":"other","event_date":"2022-01-01","date_precision":"year","country":"China","region":"Asia","canonical_url":"https://www.manufacturing.ai/topics/powering-ai#china-east-data-west-computing-2022","assertions":[{"id":"eec44586-9433-422c-8746-4ba38a3dd7a4","predicate":"event.description","statement":"China launched the east data west computing programme in 2022, directing non-time-sensitive processing of eastern data to western provinces where large solar and wind farms are sited, while time-sensitive services remain in the east.","assessment":"reported","editor_reviewed":false,"reference_only_source_count":0,"evidence":[{"id":"5e0b6952-8bb8-47da-9c0e-ad5d273562bd","stance":"supports","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}},{"id":"7d341a0d-5f2c-4dff-9976-b649e64e38db","stance":"qualifies","is_primary_for_assertion":false,"origin_independence":"unknown","note":null,"quote":null,"source":{"title":"Explainer: How China is managing the rising energy demand from data centres","publisher":"Carbon Brief","url":"https://www.carbonbrief.org/explainer-how-china-is-managing-the-rising-energy-demand-from-data-centres","source_type":"journalism","retrieval_status":"fetched","content_inspected":true,"published_at":"2025-04-16","documents":[]}}]}]}],"policy":{"publication_model":"transparency","evidence_entries_may_share_a_source":true,"linked_documents_do_not_add_verification":true,"correction_intake_available":false,"assessment_meanings":{"primary-source confirmed":"Editor-reviewed against a first-party source.","cross-source corroborated":"Editor-confirmed across two independent origins.","reported":"Supported by the attached sources; not yet editor-reviewed.","disputed":"Sources conflict; competing accounts are both attached.","superseded":"Replaced by a newer assertion.","unverified":"No supporting evidence attached."},"evidence_eligibility":"`evidence[]` contains only sources whose content was actually retrieved and read (`content_inspected: true`). Sources that could not be retrieved are counted per-assertion in `reference_only_source_count`, listed for the whole collection in `consulted_references`, and never presented as evidence. `source_count` counts only sources an assertion actually rests on — it deliberately excludes `consulted_references`, so it is never inflated by material nobody could read.","topic_scope":"Assertions and source counts are limited to the topic's current packet lineage. Reusing a concept in another topic does not silently import that other topic's assertions.","rights":"Statements are Manufacturing.ai's own prose. Source excerpts are not redistributed; `quote` is present only where explicitly cleared.","attribution":"Cite as Manufacturing.ai, https://www.manufacturing.ai/topics/powering-ai","correction_url":"https://www.manufacturing.ai/methodology#corrections"}}